Five checks before a project goes to production
First, dimensions: overall sizes, clearances, material thicknesses and every point where the new work meets the existing space.
Second, materials: descriptions, references and finishes must be clear enough for procurement and the workshop to understand the same specification.
Third, assembly logic: how pieces are divided, transported and joined, and whether the proposed sequence makes sense in the available space.
Fourth, responsibility: every pending decision needs a named person or team. Unassigned details are the easiest ones to overlook.
Finally, consistency: plans, elevations, schedules and written notes should describe one project—not four slightly different versions of it.